Taoyuan International Airport - Terminal 3

Beyond a transportation centre, Terminal 3 is a green building, expected to become Taiwan’s new landmark as well as provide entertainment and leisure.

With an expected increase from 35 million passengers in 2014 to 60 million in 2030, Taoyuan International Airport Corporation (TIAC) is launching a €1.4 billion expansion scheme for Terminal 3.

We operate as general consultant for the Terminal 3 project and provide master planning and program management services, in a joint venture with Netherlands Airport Consultants B.V. (NACO) and T.Y. Lin International.

Taoyuan Airport View

The Terminal 3 project is Taiwan’s most important construction project and also the flagship of the Taoyuan Aerotropolis Plan, which will include a new terminal building, concourses, multi-functional building, energy center, and aprons on the south, north, and west of the new terminal.

The Terminal 3 project involves the design and construction of a third terminal which will connect to Terminal 2. A ground transportation centre, car park and commercial real estate will be built between the two terminals. Also included is the development of the:

  • Baggage handling concept
  • Air traffic forecast
  • Commercial planning
  • Master plans for aviation fuel and storm water drainage
 

In addition, the work comprises a taxiway relocation, road system expansion and apron area creation. The terminals will include regional light rail system stations.

Taoyuan Airport entrance

CHALLENGE

The main challenge is to construct the new terminal while maintaining regular airport operations with minimal impact.

APPROACH

WSP | Parsons Brinckerhoff is one of three JV team members (NACO, T. Y. Lin International, WSP | Parsons Brinckerhoff). We are responsible for all E&M and IT/CT system planning works, including project management for the entire project.

Project elements:

  • T3 main building and concourse
  • Multi-function building
  • People mover system
  • Airport ground access system
  • Airside facilities - taxiway system, apron (including the fuel hydrant system, lighting system, service roads, ground service facilities operation space) and;
  • Other related systems and facilities, including electromechanical system, baggage handling system, civil engineering, utility system, air conditioning, environment, fire security system, sanitation, security, information and communication, sewage treatment, waste processing, and fuel pipeline


Taoyuan Airport side view

OUTCOME

T3 will be a smart and green terminal and is expected to become a new landmark offering a pleasant experience to travellers in Taiwan. T3 will serve as more than a transportation center, providing entertainment and leisure facilities to visitors. The airport will become an air travel hub for East Asia.

SERVICES PROVIDED

  • Terminal Area Master Planning during the planning stage
  • Project & Construction Management during the design and construction Stage