  • WSP enabled the transformation of Toronto’s waterfront into a series of sustainable, mixed-use, urban precincts integrated with parks, institutions, and open spaces.
  • We prepared a Class Environmental Assessment (EA) Master Plan for the East Bayfront and West Don Lands, addressing servicing requirements necessary to support proposed land uses.
  • Delivered innovative Class EA Master Plan process, avoiding the need for separate Class EAs for each infrastructure component.
  • Conducted the Class EA Master Plan in conjunction with the precinct planning exercise; incorporated all infrastructure components (water, wastewater, storm water, road, cycling and pedestrian facilities); and carried the project through all five phases of the MEA Class EA process.

Roles

  • Environmental Assessment
  • Project Management

Location: Toronto, Ontario