Peel Memorial Hospital Assessment, Abatement, and Demolition

 
  • WSP managed the environmental investigation, site assessment, abatement, and demolition of the Peel Memorial Hospital, in preparation for site redevelopment.
  • The Environmental Site Assessment (ESA) included investigating the effects of the storage of chemical and fuel on the property, examining the effects of road salt use, overseeing a geologic survey to assess demolition debris, and creating 15 boreholes to examine soil and groundwater conditions.
  • Soil remediation and surface water treatment were completed after building demolition, and later testing demonstrated the work was successfully completed.  

Location: Brampton, Ontario