• LinkedIn
  • Twitter
  • Facebook
  • Youtube
 
Canada  
 
 
 
 
 
 

Port Mann Bridge / Highway 1 Project

 

As part of the H5M joint venture team, WSP provided geomatics support to the design-build team responsible for the project. This includes:

  • Primary responsibility for the topographic survey of 38 kilometers of Highway 1 leading into Vancouver.
  • Using advanced technology to keep survey crews out of the traffic, enabling them to complete the topographic survey safely.

Roles

  • Topographic Surveys
  • Digital Terrain Modelling
  • As-Built Survey of Existing Utility Lines
  • HDS Scanning
  • General Geomatics Support

Location: Vancouver, British Columbia