• LinkedIn
  • Twitter
  • Youtube
 
UK  
 
 
 
 
 
 

Building Information Modelling

WSP pioneered the use of Building Information Modelling (BIM). We are now embracing it throughout our business, not just as a design tool, but as a whole new way of working to improve efficiency throughout the project lifecycle.

Bullet BIM pioneers
Bullet Improving design and construction efficiency
Bullet Adding value at every stage of the project
 
 

BIM adds value throughout the construction process

We are making BIM integral to all our project processes across the property, transportation, infrastructure and industry sectors. In addition to our role as project leader on major projects such as Crossrail’s Bond Street Station and The Place at London Bridge Quarter, we are increasingly taking on the role of lead BIM consultant.

Using BIM we add value at every stage of the construction process. During design, we ensure collaboration between multiple design disciplines to ensure better co-ordinated, faster and more effective design processes. At the construction phase, we improve efficiency by speeding up response times to design changes or site problems, improving planning capability and cost management.

Moving beyond the construction phase into operation, we are front-runners in the next stage of BIM, which will give owners and operators the ability to manage, maintain, refit and demolish their assets more effectively and efficiently.

 

Contact:

Frank McLeod
Frank McLeod UK Head of Design Process
+44 74 4521 1302