Amberly Master Planned Community

This 1,100 acre master planned community provides a blend of commercial and residential opportunities and offering natural areas, retail space, shopping, amenities and common areas.

Bullet Roadway
Bullet Utility
Bullet Stormwater Management
 
 

WSP USA coordinated the land use, zoning and environmental approvals for the Amberly Master Planned Community, as well as the Planned Development District document for the Town of Cary, NC, showing conceptual roadway, utility and stormwater management plans. Cost opinions for major infrastructure improvements were provided to evaluate the project’s financial feasibility as part of a comprehensive due diligence package preparation to support the development entitlement process. Project highlights included: 

  • Design of a new 4-lane divided roadway for approximately 2.3 miles from the south end of the site to the north end
  • Widening of a 2-lane roadway to a 4-lane roadway over a distance of 1,700 feet
  • Extension of a thoroughfare to 4-lanes for 2,350 feet to meet Town thoroughfare standards
  • Creation of extensive water and sewer facilities to service the entire western section of the Town of Cary including two major force main lines and pump stations
  • Miles of internal roadways for all types of neighborhoods including traditional single family development, townhome, town center residential and active adult
  • Creation of a community stormwater facility

WSP also designed and managed construction of a 14-acre lake and earthen dam approved to operate as a wet pond Best Management Practice (BMP), providing overall project management, coordination of the dam safety and floodplain modifications review process, construction drawings for earthen dam, lake excavation grading plan, thoroughfare roadway design crossing the lake including a double 12 x 9 box culvert, bidding and construction management services.