Blue Cross Blue Shield

This project involved a new 350,000 sf office building including a 500,000 sf open-air garage connecting to the building.

Bullet 20% water reduction
Bullet 2K KVA generator
Bullet 10K SF data center
 
 

The building includes a large multi-purpose space, conference center, training center, daycare and a full service kitchen/cafeteria. The design includes the installation of energy efficient VAV air-handling systems. The electrical design includes owner provided normal and emergency switchgear with redundant substations. 

Significant Project Features

  • Two 2,000 KVA generator set for standby/life safety
  • High efficient HVAC systems
  • 10,000 sf, data center; Level 8 with N+1 design
  • Disaster recovery design for 600 associates
  • Redundant MEP systems