Pixar Animation Studios

The project involved the construction of a new headquarters in Emeryville, California, consisting of offices, production rooms, and corporate support spaces.

Bullet 215K SF
Bullet $66M construction cost
 
 

The 215,000 square feet facility includes a commons area, three (3) screening rooms, editing suites, cafe, lounge, fitness center, and animation rendering computer equipment room. A surface parking lot for 500 vehicles and site development was also included in this project.

Four (4) of the buildings were a prototypical design consisting of 46,500 gross square feet each of office space on two (2) levels. The prototype buildings are made of heavy timber construction. The fifth building is a commons area, including a 300-seat theater, cafe, caterer's kitchen, exercise room and a daycare facility totaling approximately 24,000 gross square feet.